Catch basins

Operation: This is a really important equipment, which must be installed at the beginning of the treatment station, before the reactor to prevent entry of thick objects to it, in order to prevent possible damages and seals.

Applications: Installing before the treatment station.

Considerations:

• The diameter of the connections will be based on the size of the treatment station installed.

• It can be served with two output connections, one for the treatment station and the other to install a bypass, thus facilitating the maintenance of the reactor when necessary.

Base (mm) Heigth (mm) Diameter (mm)
1341 x 881 580 variable
1670 x 1091 750 variable

Download PDF